pre-assembled cables, each 3m long, crimp cable lug M8 to crimp cable lug M8.
48x
ABB fuse switch-disconnector type XLP2-2P
12x
Ve.Bus cable 3m
11x
Ve.Bus cable 7,5m
1x
Ve.Bus cable 5m
12x
Mersen NH fuse-link SF size 2 gG
24x
Ekrano GX
1x
Interface MK3-USB
1x
Three-phase meter ABB B24 352-100 Silver RS-485
1x
CT PRO XT 400 SELV measuring current transformer
3x
RS485 to USB interface cable 5m
1x
Anti-islanding relay Central NA protection
1x
E-BOX-48100R-C LiFePo4 Battery Pack
96x
Battery cable set 2x2Meter 25mm² for Pylontech
48x
MEGA-fuse 125A/80V
48x
Fuse holder for MEGA-fuse with blue cover
48x
LV Communication Hub for E-BOX-48100R
1x
VE.Can to E-BOX-48100R LiFePo4 Battery Pack
1x
R-Bracket (battery housing for up to 8x E-Box-48100R)
12x
Advice/service and support
1x
Adjustment of charging components to lithium battery characteristic curve
1x
Software-based DC commissioning without on-site installation
1x
⚠ Important safety note: Installation by trained specialist personnel only! ⚠
The system must be installed on site by a certified specialist company.
Improper installation can lead to life-threatening voltages, fires or system failures. Please have the installation carried out by certified specialists only!
The Ziehl relay is a safety-critical component of the central NA protection system. Suitable contactors and terminals must be selected and procured by the customer in accordance with the AC load capacity.
Not included in the scope of delivery:
DC busbars with a permanent load capacity of at least 4000A
all AC components
The system generates waste heat, the exhibition room must have adequate ventilation or cooling, otherwise there is a risk of shutdown and damage due to overheating.
The batteries weigh approx. 5 tons! The load-bearing capacity of the floor must be checked before installation.
The Victron and Pytes battery storage system may only be commissioned by a qualified installation company (AC & DC).
During commissioning, the 48VDC busbars must be pre-charged. Improper commissioning can lead to serious damage or dangerous situations.
The system must be load-free on the AC side during the entire commissioning process.
Observe the switch-on procedure:
The Quattros must not be connected to the DC mains at the same time.
They must be connected one after the other at intervals of at least 30 seconds via the respective fuses.
Failure to observe this sequence can lead to high inrush currents, damage to the system or failures.
IMPORTANT: Failure to comply with the switch-on procedure and all installation instructions specified here will invalidate both the manufacturer's warranty and the statutory warranty.
The concept must be checked and approved before ordering. Without prior inspection and approval, only the hardware will be supplied - no technical support!