Set INDUSTRIE 3 phases 491KW battery 180 kva Quattro-II
SKU SET180KW491KVA819775
Black Friday Deal --.--.--
194.113,87€
incl. 19% Taxes
Auswahl
Payment methods:
| Quattro 48/15000/200-100/100 | 12x |
|
pre-assembled cables, each 3m long, crimp cable lug M8 to crimp cable lug M8. |
48x |
|
ABB fuse switch-disconnector type XLP2-2P |
12x |
| Ve.Bus cable 3m | 11x |
| Ve.Bus cable 7,5m | 1x |
| Ve.Bus cable 5m | 12x |
| Mersen NH fuse-link SF size 2 gG | 24x |
| Ekrano GX | 1x |
| Interface MK3-USB | 1x |
| Three-phase meter ABB B24 352-100 Silver RS-485 | 1x |
| CT PRO XT 400 SELV measuring current transformer | 3x |
| RS485 to USB interface cable 5m | 1x |
| Anti-islanding relay Central NA protection | 1x |
| E-BOX-48100R-C LiFePo4 Battery Pack | 96x |
| Battery cable set 2x2Meter 25mm² for Pylontech | 48x |
| MEGA-fuse 125A/80V | 48x |
| Fuse holder for MEGA-fuse with blue cover | 48x |
| LV Communication Hub for E-BOX-48100R | 1x |
| VE.Can to E-BOX-48100R LiFePo4 Battery Pack | 1x |
| R-Bracket (battery housing for up to 8x E-Box-48100R) | 12x |
| Advice/service and support | 1x |
| Adjustment of charging components to lithium battery characteristic curve | 1x |
| Software-based DC commissioning without on-site installation | 1x |
-
⚠ Important safety note: Installation by trained specialist personnel only! ⚠
- The system must be installed on site by a certified specialist company.
- Improper installation can lead to life-threatening voltages, fires or system failures. Please have the installation carried out by certified specialists only!
- The Ziehl relay is a safety-critical component of the central NA protection system. Suitable contactors and terminals must be selected and procured by the customer in accordance with the AC load capacity.
-
Not included in the scope of delivery:
- DC busbars with a permanent load capacity of at least 4000A
- all AC components
- The system generates waste heat, the exhibition room must have adequate ventilation or cooling, otherwise there is a risk of shutdown and damage due to overheating.
- The batteries weigh approx. 5 tons! The load-bearing capacity of the floor must be checked before installation.
- The Victron and Pytes battery storage system may only be commissioned by a qualified installation company (AC & DC).
- During commissioning, the 48VDC busbars must be pre-charged. Improper commissioning can lead to serious damage or dangerous situations.
- The system must be load-free on the AC side during the entire commissioning process.
-
Observe the switch-on procedure:
- The Quattros must not be connected to the DC mains at the same time.
- They must be connected one after the other at intervals of at least 30 seconds via the respective fuses.
- Failure to observe this sequence can lead to high inrush currents, damage to the system or failures.
- IMPORTANT: Failure to comply with the switch-on procedure and all installation instructions specified here will invalidate both the manufacturer's warranty and the statutory warranty.
- The concept must be checked and approved before ordering. Without prior inspection and approval, only the hardware will be supplied - no technical support!