Skip to content

Set INDUSTRIE 3 phases 163KWh battery 90kva Quattro and 30kva Multiplus

SKU Set163KW90Kva
Black Friday Deal --.--.--
80.910,39€
incl. 19% Taxes

Auswahl

10 - 12 Weeks

Notify me when back in stock

Payment methods:
  • American Express
  • Apple Pay
  • Bancontact
  • EPS
  • Google Pay
  • Maestro
  • Mastercard
  • MobilePay
  • PayPal
  • Union Pay
  • USDC
  • Visa
Quattro 48/15000/200-100/100 6x
MultiPlus-II 48/10000/140-100/100 3x
Pre-assembled cable set Storage Set 15000VA 6x
Pre-assembled cable set storage set 10000VA 3x
RJ45 UTP cable 3m 5x
RJ45 UTP cable 7.5m 1x

RJ45 UTP cable 2m

2x

RJ45 UTP cable 5m

5x

RS485 to USB interface cable 5m

2x
ABB fuse switch disconnector type XLP2-2P 9x
Mersen NH fuse-link SF size 2 gG 15x
Cerbo GX MK2 1x
GX Touch 70 1x
CT PRO XT 250 measuring current transformer 6x
Three-phase meter ABB B24 352-100 Silver RS-485 2x
Interface MK3-USB 2x
E-BOX-48100R-C LiFePo4 Battery Pack 32x
MEGA-fuse 125A/58V 16x
Battery cable set 2x2Meter 25mm² for Pylontech 16x
VE.Can to E-Box-48100R LiFePo4 Battery Pack Cable 5m Type A 1x
LV Communication Hub for E-BOX-48100R 1x
R-Bracket battery housing 4x
Pre-programming of the Quattros and the Multiplus 1x

Adaptation of AC switching with Node Red

At 25% battery is switched to AC In 1 at 60% battery is switched to AC In 2

1x

Initial commissioning remote support

1x

DC busbars for a load capacity of up to 2000A must be procured by the customer: Dimensions Copper busbar cross-section e.g. 100 x 10mm

In emergency power mode, the generator charges with a maximum of 21kw.

Caution DVCC is not used and the batteries could be damaged.

Room temperature should never be below 7° degrees and never above 35° degrees

Attention: Observe the specified switch-on procedure - only one Quattro or Multiplus may be switched on every 30 seconds with the aid of the fuse!